Century Roofing Logo: Three Generations In Roofing!
NavBar: Projects

Drain Detail

Drain 1
1) The collar on this jolsum drain is cut back. Notice that the overflow has been covered up.
2
2) The old roofing material has been cut away from the drain and overflow.
3
3) A piece of lead is shaped for the drain.
4
4) Elastomeric roof cement is applied to both the lead and the area around the drain.
5
5) The lead is pressure sealed to the drain. Elastomeric roof cement & fiberglass web are set around the perimeter of the drain.

6

6) Latex roof cement and soft polyester waterproof the drain.

 

7

7) The completed drain. The latex roof cement and flexible acrylic coating will keep the roof from splitting even in the harshest winters on the mountain.

Decrative Image
c 2007-2009 Century Roofing
button: home button: services button: testimonials button: title 24 compliance button: email button: projects