Waterproofing
Go Back to Main Story
Coating the Roof
The Finished Deck
All embedded concrete behind the wall was removed
After the roof deck was prepared the rubberized emulsion was pumped from our tanker to the top of the silos
To keep the deck watertight a lead flashing was installed completely around the base as a counter flashing
Polyester being applied with rubberized emulsion
The finished roof
A heavy coating of rubberized emulsion being applied on top of two layers of polyester and emulsion
c 2007-2009 Century Roofing